First work on our GMC CCKW 353B

After we tested that our engine was running, we started to disassemble everything. We drained the fuel tank and found that it was in perfect condition, without any corrosion. All she had to do was rinse. Then the more demanding work began, it was necessary to disassemble, clean and reassemble the carburetor, fuel pump and gasoline filter. The exhaust pipe has a crack, so welding and straightening await us. After years of standing, we cleaned the body of the car.

 

Tags: